重钢某车间钢锭跨,厂房跨度30米,有3×10吨重级制吊车,吊车轨面标高8米,厂房下弦标高10.9米。厂房建筑在砂岩地层上。在这种天然优质岩基上建厂房,能不能取消阶梯式基础,尽量减少基础工程中的石方和混凝土工程量
There is a steel ingot span in a heavy steel workshop with a span of 30 meters and a heavy-duty crane of 3 x 10 tons. The elevation of the rail surface of the crane is 8 meters and the elevation of the factory is 10.9 meters. The building is built on a sandstone formation. To build a factory building on this natural and high-quality rock foundation can cancel the stepped foundation and minimize the amount of stone and concrete work in the foundation project.