穿越工程工程概况管道规格:ψ800mmHDPE自来水管设备型号:CASE6080水平定向钻机拖拉力:36t扭矩:18600N·m最大泥浆流量:200GPM控向仪:DCI公司月蚀控向仪施工周期:计划3天,实际2天施工单位:上海自来水特种工程公司建设单位:上海威立雅自来水有限公司施工地点:上海市
Overview of crossing engineering projects Pipeline specification: ψ800mm HDPE Water pipe equipment Model: CASE6080 Horizontal directional drilling machine Drag force: 36t Torque: 18600N·m Maximum mud flow: 200GPM Direction indicator: DCI company’s lunar eclipse direction-control instrument Construction period: 3 days, actual 2 days construction unit: Shanghai Water Special Engineering Company Construction Unit: Shanghai Veolia Water Supply Co., Ltd. Construction Location: Shanghai