1963年我局测绘生产计划的执行情况是良好的,全局各生产单位都完成了或超额完成了国家计划;测绘成果成图质量有了全面的提高;在提高劳动生产率,降低成本方面也取得了很大的成绩。这是几年以来总局测绘生产全面实现多、快、好、省较好的一年,与全国形势一样,也开始出现了全面好转的局面。据初步核实的数字,1963年全局自营测绘生产工作总量(指扣除出包工作和非生产性工作后的测绘工作总量),超额11.75%完成了国家批准的计划。按全员计算的劳动生产率比计划提高了18%。全部实物工作量都超额完成了计划指标。和1962年实际完成额相比,生产总量和劳动生产率都提高了四分之三以上。
1963 Bureau of Surveying and mapping production plan of the implementation of the situation is good, the global production units have completed or over the completion of the national plan; mapping results of mapping quality has been fully improved; in improving labor productivity and reduce costs have also been made Great results. This is a good year for surveying and mapping production of the State Administration of Survey and Mapping in an all-round way. As the situation in the whole country, it has begun to witness a complete turnaround. According to the figures initially verified, the total volume of global self-operated surveying and mapping work (referring to the total amount of surveying and mapping work after deducting outsourced work and non-productive work) in 1963 completed the nationally approved plan in excess of 11.75%. Labor productivity was calculated as full by 18% more than planned. All physical workload exceeded the planned targets. Compared with the actual amount completed in 1962, the total output and labor productivity have both risen by more than three quarters.