论文部分内容阅读
西安煤矿机械厂建成了一条年产3000~4000吨的水玻璃旧砂湿法再生流水作业线,已投入生产。落砂机下的旧砂,经筛分,细粒经混砂作背砂用;大块经锤式破碎机破碎成3毫米以下的砂粒,一部分经混砂作背砂用,一部分投入水爆池进入湿法再生流水线。铸件水爆后落入筛底的砂粒,由水力提升机提升至弧形筛,筛分后落入中间池,再由水力提升机提至一级旋流器,初步再生
Xi’an Coal Mine Machinery Factory built an annual output of 3,000 to 4,000 tons of water glass old sand wet regeneration pipeline, has been put into production. The old sand under the falling sand machine is screened and the fine sand is used for back sand by mixing the sand; the chunks are crushed into the sand below 3 mm by a hammer crusher, a part of which is mixed with sand for back sand, and the other part is put into the water bursting pool Into the wet regeneration line. After the blasting of castings, the sand falling into the bottom of the sieve is lifted to a curved sieve by a hydraulic elevator, screened and then falls into the middle tank, and then is raised to a primary cyclone by a hydraulic hoist for preliminary regeneration