Mooring Damage Identification of Floating Wind Turbine Using a Non-Probabilistic Approach Under Diff

来源 :船舶与海洋工程学报(英文版) | 被引量 : 0次 | 上传用户:wallen5202
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This paper discusses the damage identification in the mooring line system of a floating wind turbine (FWT) exposed to various environmental loads. The proposed method incorporates a non-probabilistic method into artificial neural networks (ANNs). The non-probabilistic method is used to overcome the problem of uncertainties. For this purpose, the interval analysis method is used to calculate the lower and upper bounds of ANNs input data. This data contains some of the natural frequencies utilized to train two different ANNs and predict the output data which is the interval bounds of mooring line stiffness. Additionally, in order to reduce computational time and more importantly, identify damage in various conditions, the proposed method is trained using constant loads (CL) case (deterministic loads, including constant wind speed and airy wave model) and is tested using random loads (RL) case (including Kaimal wind model and JONSWAP wave theory). The superiority of this method is assessed by applying the deterministic method for damage identification. The results demonstrate that the proposed non-probabilistic method identifies the location and severity of damage more accurately compared to a deterministic one. This superiority is getting more remarkable as the difference in uncertainty levels between training and testing data is increasing.
其他文献
针对工程项目模块化建设中的常见问题,分析了产生问题的根源,并提出改进建议,以供项目管理者借鉴.
Emissions of exhaust gases and particulate matter from a dual fuel marine engine using methanol as fuel with marine gasoil as pilot fuel have been examined for
通过对核电工程项目管理现状问题的梳理和分析,总结核电工程项目在人员、机械、物料、质量及安全方面信息数据的相关需求,提出基于“智慧工地”理念的解决方案。同时,针对智慧工地采集的信息数据,分别从人员管理、机械管理、物料管理、质量管理和安全管理五个方面进行数据分析和应用方向剖析,为核电项目和企业充分发挥智慧工地信息数据价值,实现项目精细化管理目标提供了参考和借鉴。
随着能源开发的主战场逐步由陆地深入到海洋,由煤炭、原油向新能源转化,海洋钢结构建造项目越来越多.为适应各种海域情况、海底地质、能源种类,钢结构产品也越来越丰富,如FPS
重点就石油炼化装置中弹簧支吊架如何安装与调整进行了论述,通过正确的安装与调整,来保证弹簧支吊架能够进行正确动作,补偿管道或设备的热位移,从而确保管道或设备的安全运行。
通过对素土和3∶7灰土等土壤介质进行地耐力检测,测出不同土壤介质在相同压力、相同深度下压力衰减的变化规律,在一定程度上克服了以往大型设备吊装场地地基处理只能依靠经验的缺点,为后续大型设备吊装场地地基处理提供参考和依据。
立式液硫泵在初期运转过程中会出现盘车卡涩现象,通过对该设备本体、操作等进行分析检查,找出影响液硫泵盘车卡涩的故障原因,并做出相应的处理措施,保障了立式液硫泵的正常运
全国吊装届2020年最重要的活动之一,“中联重科杯第六届全国吊装职业技能竞赛”2020年12月12—13日在湖南省长沙市举行,来自国内多个行业和地区的20家企业选派的39名选手参加了本届技能比拼。在所有参赛选手、裁判员、工作人员共同努力下,经过理论考试、预赛和决赛的层层选拔,最终来自中核机械工程有限公司的文欣以优异成绩夺得竞赛冠军。
硬质聚氯乙烯(PVC)风管广泛应用于含酸碱的排风系统,但市场上成品硬质PVC风管的规格型号有限,无法完全满足工程设计文件要求,且生产厂家定制加工费用高昂、生产周期长.为此,
石油工程建设单位施工条件艰苦,自然环境不利因素多,导致在生产过程、作业环境中存在诸多危害劳动者健康的因素.因此,需要了解并识别这些不利因素,从而进行有效的职业健康监