沂河“12·7”洪水茶山拦河坝段塌岸险情处置及经验体会

来源 :治淮 | 被引量 : 0次 | 上传用户:Tzl19801110tzl
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
2012年7月7~10日,沂沭河流域普降暴雨到大暴雨,局部特大暴雨,临沂市累计平均降雨221mm,最大雨量点24h降雨量达310mm,沂河临沂站10日13时洪峰流量8050m3/s,为沂沭河流域近20年来最大洪水。受连续强降雨及洪水影响,7月10日,沂河茶山拦河坝段上下游发生塌岸险情,严重危及堤防工程安全,经过及时抢护,险情得到有效控制,确保了沂河行洪安全。一、工程基本情况及险情沂河茶山拦河坝位于临沂城以北 July 7 to July 10, Yishu River Basin heavy rain to heavy rain, heavy rainfall, Linyi City, the cumulative average rainfall of 221mm, the maximum rainfall 24 hours rainfall of 310mm, Linyi Yiyi River at 13:00 on the 10th peak flood 8050m3 / s, Yishu River Basin in recent 20 years the largest flood. Affected by continuous heavy rainfall and flooding, on July 10, the danger of bank collapse happened upstream and downstream of Chashan Barrage in Yi River, endangering the safety of dyke works seriously. After timely arrest and protection, the danger was effectively controlled and the flood control safety of Yi River was ensured. First, the basic situation and danger of the project Yihe Dasan Barrage is located north of Linyi City
其他文献
11月8日-9日,中国航天基金会联合澳门基金会主办以“太空技术与城市生活”为主题的澳门国际航天高峰论坛,在为期两天的议程里,共举办了一场主旨演讲、一场大师论坛及三场分论
期刊
针对可控硅触发装置在实际应用中出现的故障问题,展开了调查和分析,最终确定了故障点为可控硅触发板驱动电路部分,本文针对故障问题的产生、电路原理进行了分析,并提出了处理改造
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
伴随着科学技术水平的提高,光致电化学分析法所用仪器设备也变得越来越简单,逐步向微型化发展,同时还具有较高的灵敏度以及良好选择性,应用潜力非常大。下面笔者就光致电化学分析
11月10日,全国青少年“筑梦航天”系列科普活动——“我的太空梦想”文学艺术活动(山东赛区)启动仪式在青岛市崂山区第二实验小学举办.活动由中国航天报社主办,《太空探索》
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
热媒盐、油轴流泵是丙烯酸公司的关键设备。如何在保证热媒盐、油轴流泵安、稳、长、满、优地运行就显得十分重要。本文就丙烯酸公司的热媒盐、油轴流泵在检修中所遇到的各种
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊