土坝加高培厚的几个问题

来源 :广西大学学报(自然科学版) | 被引量 : 0次 | 上传用户:vangor
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
土坝是主要的挡水建筑物之一,它具有就地取材,节省水泥、钢利和木材,便于发动群众修建,对地质条件要求较低的优点,所以至今仍广泛运用,近年来由于洪水设计标准的改变,或用水量的增加,不少土坝需要加高培厚,此外部分病坝从安全角度出发,也要进行加固处理。本文将论述土坝加高培厚的几个有关问题,这些问题对于新建土坝的设计也是具有现实意义的。 The earth dam is one of the main retaining structures. It is widely used to date because it has the advantages of local materials, saving of cement, steel and wood, easy to mobilize the masses to build and less demanding of geological conditions. In recent years, due to the flood design The standard change, or the increase of water consumption, many earth mounds need to heighten their thick, in addition to some of the dam from a security point of view, but also for reinforcement. This article will discuss several related issues of earth dam height increase thick culture, these issues for the design of new earth dam is also of practical significance.
其他文献
在其他作者提出的计算极限井网密度单井极限控制储量方法的基础上,提出了一种计算极限井网密度的新方法(修正的单井极限控制储量法)。新方法不但考虑了开发总投资及其利息,而且考
一、区域地壳稳定性 (一)基本内容与研究方法区域地壳稳定性这一术语是我国首创。所谓区域地壳稳定性,是指工程建设地区,在内外动力(以内动力为主)的综合作用下,现今地壳及
DANIEL(丹尼尔 )是流体检测、流体产品控制与分析、技术服务和整体技术方案的主要供应商 ,产品主要用于天然气与石油生产、管线传输和炼油行业。从 1999年 6月起 ,丹尼尔是EMERSON(艾默生
“长江平原湖泊区域综合开发计划的研究”一文。在这篇论文里,作者根据自己几年来对开发长江水利问题,特别是长江平原湖泊地区的治理和开发问题的深刻研究,依据中央“防洪排
本文在汇集了28个国家的458个拱坝资料的基础上,对目前各国拱坝建设发展中的一般趋势和特点作了初步的探讨性的分析,包括修建拱坝的地形地质条件、基础处理和拱坝设计中的规
在重力坝抗滑稳定分析中,一般都着重于验算最大坝高坝段在正常和非常情况下的抗滑稳定性,以确定大坝抗滑稳定的安危程度。但是,当坝下游有水且属非变幅水位的情况下,坝体抗
多点动态温度巡回检测装置是为发电厂冷却水模型测量温度而进行设计的。在潮汐河道模型中进行冷却水试验,流体温度变化快,温差小,测温点多,测点布置密,所以对测温传感器的要
由于水库的建成,河流的迳流情况发生了根本的改变,在壅水的河岸地带便产生了新的工程地质作用,其中之一就是坍岸现象。坍岸(即库岸的崩坍和后退)现象是否 Due to the compl
在一次以“推广汉语的战略”为主旨的研讨会上,分话题之一是“母语教育与外语教育”。我在发言中提出,我们还缺少一个上位概念,一个能够把母语教育和外语教育涵盖起来的概念,
国内外对工程岩体分类的研究,是从不同的工程需要出发.提出了以岩体强度和围岩稳定性为基础的各种分类方案,并由单一指标转向多因子、多参数的综合分类.如比尼阿夫斯基(Bien