某工程需要打长13米的钢板桩,而我们无相应的打桩设备,故在土设备上进行了一次改革,增加一节桩架和过桥滑轮组;向下移动活络接点(原活络接点在顶部),使该机原来只能打长8米混凝土桩为现在能打长13米钢板桩,扩大了600公斤机锤的使用范围。经使用证明:该机安装方便,移位灵活平稳,工效高(每班能打长13米钢板桩50根),改革费用低(仅3000元左右),质量符合要求。现将该机结构和安装方法介绍如下:
A project needs to hit 13 meters long steel sheet piles, and we do not have the corresponding piling equipment, so we carried out a reform on the soil equipment, added a pile rack and bridge pulley group; move the movable contact downwards (the original joints are on the top ), so that the aircraft can only play 8 meters long concrete piles can now play 13 meters long steel sheet piles, expanding the use of 600 kg machine hammer. The use of proof: The machine is easy to install, flexible and stable shift, high work efficiency (each class can play long 13 meters steel sheet pile 50), the reform cost is low (only 3,000 yuan), the quality meets the requirements. The machine structure and installation method are described as follows: