焦化厂焦油蒸馏平台为整体现浇钢筋混凝土多层框架结构,建筑底面积6×4.5米~2,共九层,全高33.70米,总建筑面积312米~2。框架各层的主梁中心位置及宽度均有变化,边梁及柱自+14.65米以上改变断面一次,柱、梁、板的混凝土均为200号。液压滑动模板是土建施工中的一项新工艺。以往在钢筋混凝土板墙、贮槽、烟囱、框架等工程的施工实践中体现出
The tar distillation platform of the coking plant is an overall cast-in-place reinforced concrete multi-story frame structure. The floor area of the building is 6×4.5 meters to 2, a total of nine floors, a total height of 33.70 meters, and a total construction area of 312 meters~2. The center position and width of the main beams of each floor of the frame are changed. The cross-section of the side beams and columns is changed from +14.65 meters, and the concrete of columns, beams, and slabs is No. 200. Hydraulic sliding formwork is a new process in civil construction. In the past, it was reflected in the construction practice of reinforced concrete slab walls, storage tanks, chimneys, and frames.