采用计算机信息处理手段和生产周期法与原型法相结合的方法 ,开发建立了“黄河河道整治工程根石管理系统” ,将工程管理部门测得的工程根石分布资料输入数据库 ,经查询、统计信息处理 ,完成根石断面图绘制、对比和根石缺石量计算工作 ,从而替代了人工点绘、计算根石断面缺石量的陈旧方法 ,为工程管理和防汛指挥部门及时掌握工程根石变化情况 ,适时进行基础加固 ,并为组织工程抢险提供决策依据
Using computer information processing method and production cycle method combined with the prototype method, a “root canal management system of the Yellow River Rehabilitation Project” has been developed and put into the database through the project root-stone distribution data measured by the project management department. After inquiry and statistical information processing, Completion of the root section of the cross-section drawing, contrast and calculation of the amount of stone-footing, replacing the artificial point of drawing, calculation of the amount of stone section of the old stone method for the project management and flood control headquarters timely grasp of changes in the project root and foundation in a timely manner to strengthen , And provide decision-making basis for tissue engineering rescue