论文部分内容阅读
为了加快特高压工程的建设周期,并为形成成熟的建设模式,国家电网公司建设部和特高压直流部2013年下达的科技项目,为特高压输电工程中换流站编制典型设计,本专篇为换流站编制典型配套的消防篇。由国家电网公司主编的特高压换流站典型设计已出版,只对消防部分进行了原则性规定,本消防篇可在执行特高压直流建设典型设计的原则下参见和参考本专篇。本专篇在我院设计的同类工程中设计中进行了实施,得到了实际工程检验和应用。
In order to speed up the construction period of the UHV project and to formulate a mature construction mode, the State Grid Corporation of China Construction Department and the UHV DC Department issued in 2013 science and technology projects for the UHV transmission project in the preparation of typical converter station design, the special articles Prepared for the converter station typical supporting fire articles. The typical design of the UHV converter station compiled by the State Grid Corporation of China has been published, and only the fire protection department has been principled. The fire protection articles can be found and referenced in this special chapter on the principle of implementing the typical design of UHV DC construction. The special articles designed in our hospital in the design of similar projects were implemented, the actual project has been tested and applied.