本文通过漫湾主机议标评标定厂过程中所取得的经验和发现的技术问题,结合电站初设中提供的水能、水机设计文件,进行初步的分析对比,主要从发挥电站投运后的经济效益出发,提出一些新的看法,供今后水轮机选型时参考。同时,提出漫湾电站应一次完成装机六台的建议和根据,供领导部门决策参考。
In this paper, through the Bay Man host negotiate bid evaluation of factory process experience and found that the technical problems, combined with the initial design of hydropower plant provided water, water machine design documents for preliminary analysis and comparison, mainly from the power plant put into operation After the economic benefits, put forward some new ideas for the future reference when selecting turbine. At the same time, it is proposed that Manwan Hydropower Station should complete the proposal and basis for the installation of six units at one time for the reference of the leading department.