在隧道施工过程中,往往会因为地质情况不良而产生程度不同的塌方,我们一方面要加强塌方前的测量和预报工作,避免发生塌方事故。但在塌方不可避免地发生后,如何处理塌方,如何恢复隧道正常施工,是隧道施工工程技术人员的难点和重点。因各个工程项目特殊性以及不同地质情况,如何正确处理塌方必须不同情况不同对待,总的原则是选择安全、方便、快捷、经济,保证人员和结构安全,保证施工方便,保证工期,保证费用最省的方案。本文根据叙(永)大(村)铁路大炮山隧道发生的塌方实例处理过程,将设计进行优化,采用双排小导管与地表注浆相结合的处理方案,既节约了造价,简化了施工工艺,是一种比较简单、安全、适用的处理方案。
In the process of tunnel construction, landslides of different degrees are often produced due to poor geological conditions. On the one hand, we must strengthen the measurement and prediction before collapse so as to avoid landslip accidents. However, after the landslide inevitably took place, how to deal with the landslide and how to resume the normal tunnel construction are the difficulties and focuses of the tunnel construction engineers and technicians. Due to the particularity of each project and different geological conditions, how to correctly handle landslides must be treated differently depending on different situations. The general principle is to choose safe, convenient, fast and economical, ensure the safety of personnel and structures, ensure the construction convenience, ensure the construction period, guarantee the most cost Provincial program. According to the example of landslide treatment in the Cannon Mountain Tunnel of Syria (Yong) Large (Village) Railway, the design is optimized and the combination of double row small pipe and surface grouting is adopted to save cost and simplify the construction process , Is a relatively simple, safe and suitable treatment options.