葠窝水库溢流坝面除险加固措施

来源 :水利水电施工 | 被引量 : 0次 | 上传用户:alsbzxx
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
葠窝水库位于太子河干流上,为大Ⅱ型水利枢纽工程。自1974年竣工以来,经过20多年的运行,溢流坝堰面砼冻融破坏严重,决定对溢流面进行加固处理。具体技术要求:堰面砼凿除从▽62.4~▽84.8m,其中▽81.0m以上为浅层砼凿除,平均凿深50mm。再用SPC聚合物砂浆进行表面抹面处理;▽81.0m以下为深层砼凿除,平均凿深500mm,切掉原钢筋。重新下锚筋及新铺钢筋网后再用滑模进行堰面砼浇筑,要求砼强度C30、F300、W6。 Shenwo reservoir is located in the mainstream of Prince Edward River, for large Ⅱ type water control project. Since its completion in 1974, after more than 20 years of operation, the weir concrete surface of the overflow dam has been seriously damaged by freeze-thaw. It is decided to reinforce the overflow surface. Specific technical requirements: Weir concrete chisel from ▽ 62.4 ~ ▽ 84.8m, of which ▽ 81.0m above for the shallow concrete chiseling, the average chisel depth 50mm. Then SPC polymer mortar surface plaster treatment; ▽ 81.0m below the deep concrete chisel exclusion, the average depth of cut 500mm, cut off the original steel. Re-anchor bar and new shop after the steel mesh with a sliding surface weir concrete pouring, requiring concrete strength C30, F300, W6.
其他文献
四川省计委近期批准红叶二级水电站正式开工建设。该电站位于阿坝州杂谷脑河 ,装机容量 9万 k W·h,年发电量 4.9亿 k W·h,项目业主为四川杂谷脑水电有限责任公司。该电站为
·历史学··中国古代史·夏商周之前是否有虞朝一种较普遍的意见认为 ,夏商周之前没有虞朝。夏代以前 ,明确称道的政治事迹 ,只有尧、舜、禹相禅让一事 ,以舜 (有虞氏 )来说
目前对于宁夏来说,林业生态产业发展是林夏林业生态建设的主要任务之一。从地理位置来说,宁夏处于我国的西北,黄河中上游地区,地理环境很差。在宁夏自治区内,土地环境极其恶
请下载后查看,本文暂不支持在线获取查看简介。王少安同志简历 Please download to view, this article does not support online access to view profile. Comrade Wang Sha
期刊
四川省水力发电工程学会召开四届九次常务理事会四川省水力发电工程学会于 2 0 0 1年 6月 2 6日在成都市召开了四届九次常务理事会议。出席会议的有各常务理事、名誉理事及其
江泽民同志指出:“哲学社会科学,是人们认识世界、改造世界的重要工具,是推动历史发展和社会进步的重要力量。”(《江泽民论有中国特色社会主义(专题摘编)》,275页)党的十六
文章分析了科研项目导向下嵌入式知识服务要素及其关系,在此基础上,构建了支持科学研究的嵌入式知识服务系统动力学模型,并对模型模拟结果进行了分析,从而获得了影响面向科研
9月 19日~ 2 1日 ,2 0 0 1年南方十二省 (市、区 )水电学会联络会议在都江堰市隆重召开。出席会议的有来自南方十二省(市、区 )的代表 30人。此次会议交流论文 18篇及新出刊的