【摘 要】
:
2009年2月26日,针对综合处理车间净化液贮罐取样分析结果达不到排放标准,对特下水池呼排管管道内擦拭取样,每秒最高170个计数,经排查确认由呼排气系统设计不合理造成各贮罐污
论文部分内容阅读
2009年2月26日,针对综合处理车间净化液贮罐取样分析结果达不到排放标准,对特下水池呼排管管道内擦拭取样,每秒最高170个计数,经排查确认由呼排气系统设计不合理造成各贮罐污染,导致综合处理车间无法运行。因此,须对污染的离交槽38V、44V,净化液贮罐11/2V、11/3
February 26, 2009, for comprehensive treatment plant cleaning fluid tank sampling analysis results not up to the discharge standards, the special pool next call pipe cleaning wipes sampling, up to 170 counts per second, after investigation confirmed by the exhaled breath System design caused by the unreasonable tank contamination, resulting in an integrated processing plant can not run. Therefore, to be polluted from the overpass 38V, 44V, purifying liquid storage tank 11 / 2V, 11/3
其他文献
随着教育改革的不断推进,小学数学教学的方式也发生了很多改变,其中数学教学和学生生活的关系变得更加密切,尤其是更加突出小学五年级数学教学的生活化应用.首先对小学五年级
Cyclin Y (CCNY) is a key cell cycle regulator that acts as a growth factor sensor to integrate extracellular signals with the cell cycle machinery. The expressi
用三甲基吡啶萃取-液闪测量法测量Purex流程还原介质中的99Tc时存在着钚的分离较为繁琐和因低价锝氧化不完全而导致的物料不衡算问题。本工作针对上述问题进行研究和改进,选
通过Fluent计算,设计了四线切分冷却器内部结构。计算结果认为,冷却器入射角的合理设计值为35°;在水压1MPa、流量100m3/h条件下,当湍流管喉口直径d分别为15、22、30mm时,对
随着放射性核束的发展,人们对奇特核区的幻数或者壳关闭问题越来越感兴趣。标准壳模型给出2、8、20、28、50、82和中子数126为原子核幻数,这对于理解核结构具有非常重要的意
Hamamatsu SHR74000 is a newly designed full three-dimensional(3D) whole body positron emission tomography(PET) scanner with small crystal size and large field o
本月,企业商品价格较上月上升0.8%,较上年同期上升6.1%。近几个月,投资品价格变化相对平稳,消费品价格呈加速上扬趋势,其中食品价格涨势最为突出。本月投资品价格较上月上升0
为了开展基于强流回旋加速器的束流脉冲化系统研究,串列升级工程技术部基于10MeV强流回旋加速器综合试验装置(CRM)新建了一条脉冲化注入线,进行束流脉冲化的实验研究。利用现
串列加速器升级工程正在研制的100MeV强流负氢离子回旋加速器采用剥离引出的方式引出能量为75~100MeV的强流质子束。剥离引出系统采用双内杆对称剥离引出方式,可以在对称两个