底图是设计、描图、审核、批准人员共同的劳动结晶,是设计生产过程最后的成品,是真实的生产记录。底图管理工作有两个方面:一是底图的保管,主要是注意防潮、防虫、防尘、防高温等。二是底图的使用,主要是设计部门重复套用底图、复制二底图、修改、作废、补充底图等工作。现在,我谈一点如何做好底图的修改、作废、补充工作的体会。经过批准了的设计文件是进行施工的主要依据,施工设备安装部门根
The bottom map is the crystallization of the common design, drawing, reviewing and approving personnel. It is the final product of the design and production process and is a real production record. Basemap management work in two aspects: First, the custody of the base map, the main is to pay attention to moisture, pest control, dust, heat and so on. The second is the use of base maps, mainly the design department to repeat the application of the base map, copy the two base maps, modify, void, add the bottom map and so on. Now, let me talk a little bit about how to make the modifications to the basemap, annulment, and supplementary work experience. After the approval of the design document is the main basis for construction, construction equipment installation department root