1975年12月新日制铁君津钢铁厂第二转炉车间的300吨转炉创造了5035炉的炉令记录,从5月27日至12月1日189天连续运转、1975年7月住友金属工业公司小仓钢铁厂第二炼钢车间曾创造了3240炉的炉令记录。这次记录的创造主要是由于用氧化镁控制炉渣技术的改进,需要修补处的检查及耐火材料的吹补技术的提高,以及停吹时保温方法的改进,用计算机进行动态控制技术的应用(提高了终点控制的精度)及加强管理等因素所促成的。
Dec. 1975 Nippon Steel Co., Ltd., a 300-ton converter at the second converter plant of Junjin Iron & Steel Co., Ltd., created a record of 5,035 kilns of furnaces, running continuously for 189 days from May 27 to December 1, July 1975 Sumitomo Metal Industries Company Kokura Steel Plant No.2 Steelmaking Plant has created a record of 3240 furnaces. The record was created mainly due to improvements in slag technology with magnesia, inspections at refinish sites and improvements in blow-up technology for refractories, as well as improvements in insulation methods at blow-down, the use of a computer for dynamic control technology Improve the accuracy of the end point control) and strengthen management and other factors contributed.