论文部分内容阅读
我班全体同志,在党的教育下,思想不断提高,工作不断改进。特别是上级提出要求我们这个输电工程要达到“施工质量标兵”的号召后,我们全班同志坚决响应了这一号召,检查了过去认为甲方验收就算质量合乎要求的看法,下决心以高标准要求自己,坚决按设计要求,按标准施工,千方百计把各项工作做好、做完,不留缺陷,力争质量高标准。我班在提高施工质量方面所做的主要工作是:
All the comrades in our class, under the education of the party, have continuously improved their thinking and continuously improved their work. In particular, the higher level asked us for the transmission project to achieve the “quality of construction workers,” the call, our class comrades resolutely responded to this call, check the past that the inspection of Party A, even if the quality of the requirements of the view, determined to a high standard Ask yourself, firmly according to design requirements, according to standard construction, do everything possible to do a good job, done, without leaving defects, and strive to high standards of quality. My class in improving the quality of construction done by the main work is: