论文部分内容阅读
对湾则水电站施工过程中产生的水土流失进行了预测,并结合当地情况设计了水土保持方案。
The prediction of soil erosion in the process of construction of the Wanzhai Hydropower Station was carried out and the soil and water conservation plan was designed according to the local conditions.