论文部分内容阅读
近日,笔者听说过这样两件事:其一,某县新建的多功能会议厅,因电路故障,多次在重要场合发生断电现象。又因设计图纸不知下落,维修人员无从着手,万般无奈,只好弃用暗线,改走明线。虽然故障得以排除,但原来富丽堂皇的会议大厅却面貌全非。其二,某住宅小区在征地、拆迁
Recently, I heard of such two things: First, a new multi-purpose conference hall in a county, due to circuit failure, many times in an important occasion power outage. Because of the design drawings do not know the whereabouts of maintenance staff can not proceed, helpless, had to abandon the dark line, change the light line. Although the fault can be ruled out, but the original magnificent conference hall was completely different. Second, a residential area in the land acquisition, demolition