Rockburst,earthquake and blasting cause some dynamic loads on rock support and rock reinforcement system.Elements of rock support and rock reinforcement are gen
Pre-grouting ahead of tunnels has three main functions:to control water inflow into the tunnel,to limit groundwater drawdown above the tunnel,and to make tunnel