隧道的施工就工程难度来说比一般地质条件下的施工要高许多,因此在进行隧道施工时,要充分考虑到各方面的因素,制定出详细的施工方案。本文首先说明了歇马隧道总体的布置以及隧道的线型施工方案,然后说明了歇马隧道建筑限界的施工以及隧道内轮廓设计的施工,接着说明了歇马隧道洞口的施工,最后说明了隧道洞身结构施工方案。
The tunnel construction is much more difficult than the construction under normal geological conditions due to the difficulty of the project. Therefore, when carrying out tunnel construction, full consideration should be given to various factors and a detailed construction plan should be worked out. This paper first describes the overall arrangement of the tunnel in Shwema and the tunnel construction program, and then explains the construction of the Shima tunnel construction boundaries and the construction of the outline design of the tunnel. Then explains the construction of the tunnel in the Shima tunnel. Finally, the tunnel Cave structure construction program.