论文部分内容阅读
本文探讨高边坡开挖与加锚的优化设计,主要是预应力锚索的最优间距和开挖的最优顺序.对某大型水电工程的应用计算显示,成果可信.
This paper discusses the optimal design of high slope excavation and anchoring, mainly the optimal spacing of prestressed anchor cable and the optimal sequence of excavation. The application calculation of a large hydropower project shows that the results are credible.