网络技术目前在建筑业中应用较为广泛。对于建筑工程项目的工期和成本。也可运用网络技术,使之达到最优化的目的。建筑业的工程成本可分为直接费用和间接费用两大部分。直接费用是由材料费、人工费、机械使用费、其他直接费等构成,间接费是施工过程中组织和经营管理的全部费用。直接费与建筑产品各道工序的完工工期有关,要求比正常施工的工期缩短,就会影响直接费用增加。间接费一般按工期长短分摊,因而随着工期的缩短而减少。所以运用网络技术分析直接费用与生产过程各工序作业时间的关系,可以找出既缩短工期,又降低工程总成本的最优方案。不同的工程项目和不同的工序的工期变化,对其直接费用的影响是不一样的。在工程项网络计划制订之后,欲使工期和成本优化,还必须取得如下数据: 1、正常工期tig,即网络图各工序完成作业
Network technology is currently widely used in the construction industry. Duration and cost of construction projects. Can also use the network technology, so that it can achieve the purpose of optimization. Construction costs can be divided into direct costs and overhead costs of two major parts. The direct cost is composed of material fee, labor fee, mechanical fee, other direct fee and so on. Indirect fee is the total cost of organization and operation and management during construction. The direct costs are related to the completion of the various processes of the construction products. The shorter the duration of the construction than the normal construction, the direct costs will be affected. Indirect costs are generally apportioned according to the duration of the project and therefore decrease as the duration of the project decreases. Therefore, using network technology to analyze the relationship between direct costs and operating time of each process in the production process, we can find the optimal solution that can shorten the construction period and reduce the total cost of the project. Different projects and different process changes in duration, the direct costs of its impact is not the same. In the project network planning after the schedule and cost optimization, you must also obtain the following data: 1, the normal duration tig, that is, the network diagram to complete the operation of the process