论文部分内容阅读
1 丹江口水库工程建设概况丹江口水库位于豫、鄂、陕三省结合部,是治理开发汉水资源的一项关键工程,也是即将实施的南水北调中线工程的水源工程。该工程于1958年9月动工兴建,1962年3月因主体工程出现质量事故,工程暂停施工,1964年12月复工续建,1967年开始蓄水,1973年主体工程建成。枢纽位于湖北省丹江口市境内,距丹江与汉江汇流口下游800m 处,是一座集防洪、发电、灌溉、航运、旅游和养殖功能于一体的综合水利枢纽,枢纽由拦河大坝、发电站、升船机和引水渠道组成。工程总投资10
1 Overview of Danjiangkou reservoir construction Danjiangkou reservoir is located in the junction of Henan, Hubei and Shaanxi provinces. It is a key project for harnessing and developing Han water resources and is also the water source project for the upcoming midline project of South-to-North Water Diversion. The project started construction in September 1958, 1962 March due to the quality of the main project accidents, construction suspension, resumed construction in December 1964, 1967 began to impound, the main project was completed in 1973. Located in the territory of Danjiangkou City, Hubei Province, 800m downstream from the junction of Danjiang River and Hanjiang River, the hub is a comprehensive water control project integrating flood control, power generation, irrigation, shipping, tourism and aquaculture. The hub is composed of dam dams, power stations , Ship lift and diversion channels. Total investment in the project 10