论文部分内容阅读
(一)为适应汛期情况便利工作贯澈制度防止浪费在汛期发生新险或因堤壩塌坍、蛰陷原存备防料不敷应用,确需追加工料时,应按下列办法办理:(甲)说明水情、工情变化情况及治理意见,和所需工料编造预算派专人逐级上报,经批准后施工。(乙)如因情况严重,须先用电话或电报报会,经同意后,一面作计划,一面备料施工。(丙)如因情况危急,应一面备料施工,一面作计划造预算,勿因制度限制而使工程受到严重损害,要以不出乱子为原则。
(A) to facilitate the work of flood season to comply Che Che system to prevent waste of flood insurance in the flood season due to new risks or dams collapse, stubborn original reserves of anti-material less than the application, the need to additional materials, should be handled as follows: (A ) Describe the water conditions, work conditions and changes in governance advice, and the required materials prepared by the budget specialists reported step by step, after approval of the construction. (B) If the situation is serious, we must first give a telephone or telegram to the public. After we have agreed, we will plan and prepare for construction. (C) If the situation is critical, we should prepare for the construction on the one hand and make a plan on the other to make a budget. We will not cause any serious damage to the project due to system constraints. We should take no confusion as principle.