在闻名中外的永定河卢沟桥上下,最近建成了一组新的水工建筑物——永定河卢沟桥防洪枢纽。它包括两闸和大宁水库两部分。两闸,即永定河拦河闸和小清河分洪闸。两闸处在同一轴线上,以分水堤相联,全长410米,共29孔,安装12×6.5米的弧形闸门,其中左侧的永定河拦河闸18孔,控制着永定河,右侧的小清河分水闸11孔,可分洪泄入小清河。大宁水库包括主,副坝,东、西围堤,泄洪闸和库底开挖等6项工程。整个枢纽工程量计土石方1200万立方米,混凝土11万立方米。永定河洪水直接威胁首都,是全国四大重点防汛河流之一。由于官厅水库泥沙淤积,官厅水库以下的山峡历来是暴雨中心,一遇特大洪水,永定河下游宣泄不及,势需在卢沟桥附近向西岸分洪,以保北京市区安全。但多年以来,分洪措施一直未能落实。每年汛期不得不以大量人力、物力防汛抢险。
In the famous Yongding River Lugou Bridge up and down, recently built a new group of hydraulic structures - Yongding River Lugou Bridge flood control hub. It includes two gates and Daning reservoir in two parts. Two gates, that is, Yongding River Barrier and flood control floodgate. Two gate at the same axis, in order to divert embankment associated with a total length of 410 meters, a total of 29 holes, the installation of 12 × 6.5 meters of the arc gate, of which the left Yongding River Barrier 18 holes, controlling the Yongding River , The right of the Qing Xiao River sluice 11 holes, flood diversion into Xiaoqing River. Daning reservoirs include the main dam, auxiliary dam, east and west embankments, flood gates and bottom excavation 6 projects. The entire hub project contains 12 million cubic meters of earthwork and 110,000 cubic meters of concrete. The Yongding River flood directly threatens the capital and is one of the four major flood-control rivers in the country. Due to the sedimentation of Guanting Reservoir, the gorge below the Guanting Reservoir has always been the center of heavy rain. In case of catastrophic floods and the lower reaches of the Yongding River, it is necessary to flood the West Bank near the Lugou Bridge so as to ensure the safety of Beijing. However, flood diversion measures have not been implemented for many years. Have to flood each year a large number of manpower and material resources flood control.