二滩水电站机电设计

来源 :水力发电 | 被引量 : 0次 | 上传用户:ww830625
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
二滩水电站装有6台单机容量550MW的机组,发电机与变压器组合采用单元接线,以4回500kV架空线与四川电力系统联网。主要机电设备按世行采购导则进行国际招标,机组由加拿大GE公司中标,水轮机型号HLF497-LJ-625.7,发电机为半伞式,下导与推力轴承结合位于下机架上。电站按少人值班设计,以计算机监控为主,完成对全厂机电设备的监视与控制。 Ertan hydropower station equipped with six units of 550MW capacity of units, generators and transformers with unit wiring, with 4 back to 500kV overhead lines and Sichuan power system networking. The main mechanical and electrical equipment will be subject to international bidding according to the World Bank procurement guidelines. The unit is won by Canadian GE Company. The turbine type is HLF497-LJ-625.7. The generator is a half-umbrella type and the lower guide and thrust bearing are combined on the lower frame. Power station by less people on duty design, mainly to computer monitoring, complete the whole plant mechanical and electrical equipment monitoring and control.
其他文献
在长江数字航道工程建设过程中,为了实现航道尺度的动态监测和尺度预警的自动化,研究了一套以GIS应用为数据处理和展示平台的应用系统,可基于最新水下地形测量数据,依据航标动态监测系统提供的航标位置坐标自动确定航道动态边界,并将实测水位站实时水位和预测水位信息叠加到GIS平台上进行空间计算,对指定区段航道的实际最浅水深、最窄宽度、最小弯曲半径等航道实际尺度数值进行计算和实时动态监测,并根据预测水位进行航
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
在建筑暖通工程施工中,要合理应用建筑暖通工程的施工技术,结合建筑暖通工程的施工要点,提高暖通工程施工质量.同时还要加强监管力度,加强对建筑材料质量的控制以及对施工人
东风再度出手国际合作。2012年11月16日,东风汽车集团股份有限公司与德国史密斯股份公司战略合作项目合资合同签约仪式在武汉举行。根据合同,东风汽车集团与史密斯股份公司共
上海金翰电子商贸有限公司网上非法传销金箔画案; 上海华树塔美容有限公司非法传销美容会员卡案; 北京大雅堂商业发展有限公司“送配原始认股权证”变相传销案; 北京瑞丽爱
在数学课堂教学中,教师应丰富教学手段,想方设法去激发学生的学习兴趣,让学生爱上数学,爱上数学课,把爱数学的热情融入数学课堂中,从而提高课堂效率.高效的完成课堂教学任务.
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
根据国内外温室设计及工业与民用建筑设计规范,以华东型连栋塑料温室为例,对在相同的基本雪压作用下,采用不同的设计标准,拱杆承受雪荷载的能力进行了对比分析;同时结合工程实践,提
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊