论文部分内容阅读
奎屯河除险工程主要包括三部分内容 :①新龙口滑坡体拉运 :②12km防洪堤新建 ;③新建临时龙口 ,其中新建防洪堤为重力式砼挡土墙结构。在样板段施工中 ,检拆模后发现基础根部烂根。斜背面蜂窝\麻面同直面相比较多。笔者在工地上进行了跟踪调查 ,将这一质量通病进行了原因
The Kuytun River Danger Removal Project mainly consists of three parts: ① New Longkou landslide pull: ② 12km flood levee new construction; ③ temporary temporary mouth, of which the new flood embankment is gravity concrete retaining wall structure. In the construction of the sample section, after the demolition of the model found that the roots of the root rot. Diagonal back of the honeycomb Ma face with more than the face. The author conducted a follow-up survey on the site, the reasons for the quality of the common cause