论文部分内容阅读
6月16~17日,自治区水利重点项目办常务副主任、水利厅副厅长于长剑带队深入赤峰市三座店水库和红山水库就安全度汛工作进行检查指导。于长剑副厅长在三座店水库详细了解了汛前准备、责任制落实、预案制定和执行等情况。重点查看了水库大坝及大坝下游渗漏情况,详细询问了渗漏观测分析和检测情况,并强调:一要提高认识,严格遵守防汛值班
From June 16 to June 17, Deputy Director of the Water Resources Key Project Office of the autonomous region and deputy director of the Water Conservancy Department led the team to instruct the Sanzadian Reservoir and Hongshan Reservoir in Chifeng City to inspect and guide the flood safety work. Deputy Director Chang Jian learned in detail about the preparations for the flood season, the implementation of the responsibility system, the formulation and implementation of the plan and so on in the Sandian Reservoir. Focus on the seepage of the dam and dam downstream leakage, asked in detail the leakage analysis and detection of the situation, and stressed: First, to raise awareness and strictly observe the flood control duty