论文部分内容阅读
改革开放十年,我国对外承包工程事业迅速发展,合同额和营业额数量可观。去年下半年开始治理整顿,国家抽紧银根,资金成为对外承包工程的“瓶颈”;多数工程项目固定资本回收期限长,资金积压多,资金利用率又相当低。为尽快解决这些矛盾,本文提出改革折旧制度的若干建议,供有关方面参考。
Ten years of reform and opening up, China’s foreign contracted projects have developed rapidly, and the amount of contracts and turnover is considerable. In the second half of last year, the government began to rectify and rectify the situation. The state tightened monetary policy and funds became a “bottleneck” for foreign contracted projects; most of the projects had a long period of fixed capital recovery, a large backlog of funds, and a relatively low capital utilization rate. In order to resolve these contradictions as soon as possible, this paper proposes several proposals for reforming the depreciation system for reference by relevant parties.