论文部分内容阅读
瓦轴厂与大连市物资局于1971年9月13日签订协议,双方投资合建一座5吨电炉炼钢车间(现炼钢分厂)。市物资局土建投资115万元,75年经一机部设计总院申请,一机部批准,给予设备投资132万元。建这一车间的目的是为处理瓦轴厂每年产生的大约1.5—2.0万吨废车屑,这样作既减少了车屑的占地问题,使环境得到保护,同时又能使这些废钢屑得到有效利
Wazhou Plant and Dalian Municipal Bureau of Materials signed on September 13, 1971, the two sides invested to build a 5-ton EAF steelmaking plant (now Steel Plant). Municipal Bureau of civil engineering capital investment 1.15 million yuan, 75 years by a machine design headquarters to apply for a machine department approval, giving equipment investment 1.32 million yuan. The purpose of building this workshop is to treat approximately 15-20,000 tons of scrap produced each year by the Wazhou Plant, thus reducing the problem of land occupation and protecting the environment while at the same time enabling these scrap pieces to be obtained Effective