三十二工程处东风掘进队,有职工61人,其中队干部4人。自1977年以来在兴隆庄矿井施工中连续四年上等级。77年实际进尺1141.5米,折算进尺1631.9米,达到甲级队。78年实际进尺624.1米,折算进尺1163.1米,达到丙级队。79年实际进尺948.7米,折算进尺1558.9米,达到甲级队。进入80年,在施工安排与施工条件困难的情况下,继续狠抓循环争快速,实际进尺为749.8米,折算进尺1009.4米,达到丙级队。连续四年跨入等级队行列。1977—1980年,东风掘进队主要施工的工程见表1,皆为全岩巷道,绝大部分是上
Thirty two Agency Dongfeng Tunneling Team, a staff of 61 people, including four squadron cadres. Xinglongzhuang mine construction since 1977 for four consecutive years on the grade. The actual footage of 77 years was 1141.5 meters, converted into footage of 1631.9 meters and reached Grade A team. The actual footage of 78 years was 624.1 meters, converted into footage of 1163.1 meters and reached Grade C. The actual footage of 79 years was 948.7 meters, converted into footage of 1558.9 meters and reached Grade A team. In the 80 years, with the difficult construction and construction conditions, the Group continued to pay close attention to the rapid development of circular economy with an actual footage of 749.8 meters, which was translated into footage of 1009.4 meters and reached Grade C. For four consecutive years into the ranks of ranks. From 1977 to 1980, the main works of the Dongfeng Tunneling Team are shown in Table 1, all of which are all rock roadways, most of which are on