论文部分内容阅读
大型水压机上横梁的安装,表现了武建工人精益求精的精神。负责施工的是武建机装工程处七工段郭洪余钳工组和王宪荣架工组。上横梁重76吨多,用两台吊车联合抬吊,
The installation of beams on a large hydraulic press shows the spirit of Wujian workers’ improvement. Responsible for the construction of the Wujian Machine Assembly Agency seven sections Guo Hongyu fitter and Wang Xianrong frame work group. On the beam weighs more than 76 tons, with two cranes lift joint,