论文部分内容阅读
提出了新副井提升设备的设计方案,并对该技术方案进行了分析比较,进行了提升机、提升容器、钢丝绳等的选型计算及校验,安全可靠性完全满足《煤矿安全规程》的要求。
The design scheme of the new auxiliary shaft hoisting equipment is put forward and the technical scheme is analyzed and compared. The calculation and verification of hoisting machine, hoisting container and wire rope are carried out. The safety and reliablity fully meet the requirement of “Coal Mine Safety Regulations” Claim.