论文部分内容阅读
文章结合实际项目,介绍平板竖向静载荷试验和静力触探试验的现场检测方法,同时阐述检测结果的处理与判断,旨在证明采用堆载预压的方法加速地基的沉降和增加地基的稳定性是一种切实可行的施工工艺。
Based on the actual project, this paper introduces the on-site inspection methods of vertical static load test and static contact test of the flat plate, and expounds the handling and judgment of the test results. The purpose of this paper is to prove that the method of surcharge preloading can accelerate the subsidence and increase the foundation Stability is a viable construction process.