论文部分内容阅读
The year-round operation time of HIRFL is 7009 h in 2012,the total beam time is about 4983.6 h(from 21 Dec.2011 to 2012),which include 2302.7 h for physics experiment,563.7 h for life science research,1422hfor material science research,695.2hfor machine research,and 249 h for time-sharing for the beam.There are 19 heavy ions beams were provided by HIRFL in 2012.The highest ions energy provided is 400 MeV/u,the maximum accumulated ion intensity is 800 μA.
The year-round operation time of HIRFL is 7009 h in 2012, the total beam time is about 4983.6 h (from 21 Dec. 2011 to 2012), which includes 2302.7 h for physics experiment, 563.7 h for life science research, 1422 h for material science research, 695.2hfor machine research, and 249h for time-sharing for the beam.There are 19 heavy ions beams were provided by HIRFL in 2012.The highest energy energy is 400 MeV / u, the maximum accumulated ion intensity is 800 μA .