论文部分内容阅读
福宁高速公路作为沿海黄金大通道同三线(黑龙江同江—海南三亚)福建段的重要组成部分,于2003年6月建成通车,全长约141公里。随着福宁高速公路交通流量的不断加大,隧道监控也随之提高等级,部分隧道内原有监控设备设置已不满足相关要求,为使福宁高速隧道监控设施的设置更加科学、规范、系统,提高高速公路的服务水平,加强隧道安全运行管理,按照JTG D70/2-2014《公路隧道设计规范》要求完善隧道监控设施,对福宁
As an important part of the Fujian-Dalian section of Coastal Gold Passageway with the Third Line (Heilongjiang Tongjiang-Sanya, Hainan Province), Funing Expressway was opened to traffic in June 2003 with a total length of about 141 kilometers. With the continuous increase of traffic volume on Funing Expressway, the tunnel monitoring will also be upgraded. Some of the original monitoring equipment in some tunnels have not met the relevant requirements. In order to make the setting of the Funing high-speed tunnel monitoring facilities more scientific, standardized and systematic , Improve the service level of the expressway and strengthen the management of the safe operation of the tunnel. Improve the tunnel monitoring facilities according to the requirements of JTG D70 / 2-2014 “Design Code for Highway Tunnels”