论文部分内容阅读
翻模施工,就是利用一定高度、一定层数的组合钢模代替木模。在混凝土浇筑过程中,下层钢模中的混凝土达到一定的龄期,其强度能承受自身及上层混凝土的重量时,即可拆除下层钢模板,往上继续加立,继续浇筑。这种利用组合钢模反复拆立,混凝土高度不断上升的施工方法就叫翻模施工。翻模施工与木模施工比较,具有速度快、工期短、节约木材、节约资金、减轻劳动强度等优点。与液压滑升模板施工比较具有投资小、操作简单、不易变形,大中小型水工建筑均适用的优点。从扬州市水利工程队运用翻模施工工艺在高邮运东车船闸施工的实际应用可得
Turn mold construction, is the use of a certain height, a certain number of combinations of steel mold instead of wood. In the concrete pouring process, the concrete in the lower steel mold reaches a certain age, and its strength can withstand the weight of itself and the upper concrete, the lower steel formwork can be removed. This combination of steel mold repeatedly dismantling, the continuous rise of concrete construction method is called turn over construction. Turnover mold construction and wood mold construction compared with a fast, short construction period, save timber, save money, reduce labor intensity and so on. Compared with the construction of hydraulic sliding template has the advantages of small investment, simple operation, not easy to deformation, large and small hydraulic construction are applicable advantages. Practical application of turning mold construction technology from Yangzhou Water Conservancy Engineering Team to construction of Gaoyou East Vehicle Lock