龙羊峡水电站位于青海省境内黄河干流上,在正常高水位时,相应库容为247亿立米。拦河大坝为重力拱坝,最大坝高175米;厂房为坝后地面式,装有4台、单机容量为32万千瓦的水轮发电机组,总装机容量为128万千瓦;泄水建筑物有岸边溢洪道,穿过坝体的中、深、底孔泄水道。枢纽设计洪水流量为7060秒立米,校核洪水流量为10500秒立米,经过水库调蓄后要求下泄流量分别为5000秒立米和8000秒立米。
Longyangxia Hydropower Station is located in the Yellow River in Qinghai Province, the main stream in the normal high water level, the corresponding storage capacity of 24.7 billion cubic meters. Dam for the gravity dam arch dam, the maximum height of 175 meters; dam for the ground after the dam, equipped with four units, a single capacity of 320,000 kilowatts hydroelectric generating units, with a total installed capacity of 1,280,000 kilowatts; There are shore spillway, through the dam body, deep, bottom hole drainage. Hub design flow of 7060 seconds of legislation legislation to check the flood flow of 10500 seconds of legislation, after the reservoir storage requirements of discharge flow were 5000 seconds and 8000 seconds of cubic meters.