论文部分内容阅读
在首都钢铁公司,我听到这样一些故事: 初轧厂机动科设备工程师刘景涛,对本厂的主轧机作了调查分析,提出了一个新的设想:如果每轧一块钢坯的时间缩短一秒钟,全厂一年就可以多产钢坯一万三千八百零六吨,为国家增收一百六十五万元。他的这个建议,得到厂长、轧钢工人和其他技术人员的支持。今年二月,他和几位同志一起,对主轧机进行了转速分档自动控制的革新,结果,每块钢坯的轧制时间缩短了一点三秒。从三月到六月,已增产
At Beijing Capital Iron and Steel, I heard stories like this: Liu Jingtao, Equipment Engineer, Mobility Section, CHASSIS, conducted a survey and analysis of the main mill in our factory and proposed a new idea: if the time for rolling a billet is shortened by one second, The whole plant can produce 13806 tons of billets in one year and 1,650,000 yuan for the country. His suggestion was supported by the factory manager, the rolling workers and other technicians. In February of this year, he and several comrades conducted an innovation on the automatic control of the speed of the main rolling mill. As a result, the rolling time per slab was shortened by 1.3 seconds. From March to June, production has been increased