论文部分内容阅读
英国钢铁公司决定投资1400万英磅,在蒂兹赛德厂氧气炼钢车间建设一套新的烟气排放控制系统。此次投资是该公司1.5亿英磅环保工程基建投资中的第一笔开支。一期工程是建设带有全烟气收集和净化装置的铁水脱硫设备,以取代现有的鱼雷式铁水包喷吹系统,为炼钢用铁水处理提供烟气排放控制装置。
British Steel decided to invest 14 million pounds to build a new smoke emission control system at the Tysons Oxygen Steel Works. The investment is the company’s first investment in 150 million pounds of environmental engineering infrastructure. The first phase of the project is the construction of a hot metal desulphurization plant with a full flue gas collection and purification unit to replace the existing torpedo ladle blowing system and to provide flue gas emission control devices for hot metal treatment of steelmaking.