论文部分内容阅读
2013年06月13日~06月17日,锦屏一级水电站工程第二阶段蓄水安全验收会议在锦屏一级工地现场隆重召开。本次会议由中国水电水利规划设计总院副总工程师党林才主持,中国水电水利规划设计总院、雅砻江流域水电开发有限公司及锦屏建设管理局、中国水电顾问集团成都勘测设计研究院、长江水利委员会工程监理中心、中国水利水电建设工程咨询公司西北公司、中国水利水电第七工程局有限公司、中国葛洲坝集团股份有限公司、中国水利水电第十四工程局有限公司、中国水利
From June 13, 2013 to June 17, 2013, the second phase of water storage safety acceptance meeting of Jinping I Hydropower Station was grandly held at the site of Jinping Class I site. The meeting was chaired by the deputy chief engineer of China Hydropower Planning and Design Institute Dang Lincai, China Hydropower Planning and Design Institute, Yalong River Basin Hydropower Development Co., Ltd. and Jinping Construction Authority, China Hydropower Consultants Group Chengdu Survey Design Research Institute, Yangtze River Water Conservancy Commission Engineering Supervision Center, China Water Conservancy and hydropower construction engineering consulting firm Northwest Company, China Water Conservancy and hydropower Seventh Engineering Bureau Co., Ltd., China Gezhouba Group Co., Ltd., China Water Conservancy and Hydropower Engineering Bureau Co., Ltd. 14, China Water Conservancy and Hydropower