经过十三年建设,采用高扬程、大流量泵站的中型电力抽水工程——港口抽黄灌溉工程,于1990年12月14日通过了省、地联合组织的竣工验收,正式投入运用。港口抽黄工程是由省、地、县投资2442.88万元,群众投劳300万个工日建成的。渠首位于潼关县港口镇。该工程采取多级抽水的办法,灌溉潼关县、华阴县的9.8万亩农田,解决灌区5万人的饮水困难问题。这项工程的建成,特别是高扬程、大流量泵站
After 13 years of construction, adopting the medium-sized power pumping project of high-lift and large-flow pump stations - pumping pumping water from the port, completed the inspection and acceptance on December 14, 1990, and was officially put into operation. Port pumping yellow project is the provincial, prefectural and county investment 24,428,800 yuan, the masses of labor 3 million days built. The head of the canal is located in Tongguan County town. The project adopts a multi-level pumping scheme to irrigate 98,000 mu of farmland in Tongguan and Huayin counties to solve the drinking water problem of 50,000 people in the irrigated area. The completion of this project, especially high-lift, high-flow pump station