Numerical verification of geometry control method of the construction for super-span cable-stayed br

来源 :中国工程科学:英文版 | 被引量 : 0次 | 上传用户:galadelong
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Taking Sutong Bridge as the object investigated, the correctness of the geometry control method is verified by numerical simulation analysis. Taking the impact of geometric nonlinearity into account, the impacts of structural geo- metric profile induced by temporary loads and temperature field during the construction procedure are investigated. The simulation results indicate that only the stage state of the structure during construction is affected. Satisfied outcome of construction control can be achieved based on ~eometrv control method.
其他文献
期刊
期刊
期刊
期刊
进入21世纪,国家高度重视海洋的发展及其对中国可持续发展和安全的战略意义.因此,海洋工程与科技的发展受到广泛关注.rn自2011年7月以来,中国工程院先后开展了“中国海洋工程
期刊
@@
Based on Edong Yangtze River Bridge, which is the second longest hybrid girder cable stayed bridge with 926 m long main span, the influencing factors and crucia
期刊
期刊
期刊