论文部分内容阅读
本文通过晋西机器厂在西峪煤矿矿界处兴建库房的实例。搜集了大量的地质采矿资料,并经过详细的勘察后,应用了建筑物下采煤的新技术和新方法,对采煤引起的地面移动和变形及预留保安煤柱进行了计算,从而对煤矿未来开采区地面拟建厂房的稳定性做出了科学的评价。
This article through the Shanxi Machinery Factory in Xiyu coal mine construction of the Treasury Department instance. A large number of geological mining data were collected and after detailed investigation, new techniques and new methods of coal mining under buildings were applied to calculate the ground movement and deformation due to coal mining and to reserve the safety pillars Mine future mining area on the ground to be built plant stability made a scientific assessment.