论文部分内容阅读
文章通过对龙王头湾大桥现浇梁移动模架堆载预压数据的采集、整理,以及现浇梁桥面高程控制要点的阐述,结合该桥的实际工程特点,介绍了移动模架施工测量和监测方法,总结了现浇箱梁移动模架施工测量的经验。
This paper elaborates on the collection and arrangement of the preloading data of the cast-in-situ girder of the cast-in-situ Beam of Longwangtou Bay Bridge and the key points of the bridge deck elevation control. Combined with the actual engineering features of the bridge, the construction measurement of the movable formwork And monitoring methods, summarizes the experience of cast-in-place box girder moving formwork construction measurement.