论文部分内容阅读
本文结合一个工程设计实例,给出钻孔灌注桩+一层混凝土支撑支护结构的计算方法、计算中应注意的问题及构造措施。
In this paper, an engineering design example is given to calculate the calculation method of bored piles and a layer of concrete supporting and supporting structures, the problems that should be noticed in the calculation and the construction measures.