Managing Risk in Oil and Gas Facilities Through a Properly Designed Asset Integrity Management Progr

来源 :第八届全国腐蚀大会暨第217场中国工程科技论坛 | 被引量 : 0次 | 上传用户:woheni187170713
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  A successful Asset Integrity Management (AIM) plan has its roots formed during the project phase.Quality assurance through diligent and professional inspection during engineering project construction is required in order to provide accuracy of the necessary records and drawings that will be used by the imp.Support for the AIM plan by senior project management and owner company management must be evident throughout design and construction in order to gain commitments from the different disciplines within the project team.As the project progresses to the operations phase, a clear understanding of the roles of operations, maintenance, and engineering must be outlined and agreed upon.Failure to achieve the cooperation of these teams inevitably leads to costly mistakes.This presentation outlines the necessary ingredients for a successful AIM plan while using examples from various oil and gas projects, both onshore and offshore to illustrate the above points.
其他文献
众所周知,腐蚀问题是世界各国共同面临的问题,凡是使用材料的地方,都不同程度地存在腐蚀问题.据统计估算,全世界每80秒钟就有一吨钢铁变成铁锈.腐蚀不仅会缩短构筑物的使用寿
会议
会议
  热障涂层(TBCs)是将耐高温、抗腐蚀、高隔热的陶瓷材料涂覆在基体合金表面,以提高基体合金抗高温氧化腐蚀能力、降低合金表面工作温度的一种热防护技术。热障涂层技术是
  Nanomedicine today is mainly based on chemical conjugates or nano carriers such as lipids,micelles, nanorods, dendrimers and so on.In those carriers, dendri
会议
会议
会议
会议
  Gene therapy has gained much attention as a potential approach for cancer treatment relying on the deliver of a missing gene or a functional substitute of a
会议
会议
会议