陈村水电厂作为安徽省最大的常规水力发电厂,在安徽电网中主要发挥顶峰和事故备用的作用。本文以2007~2011年陈村水电厂机组在迎峰度夏期间多台次紧急开机顶峰缓解电网压力、配合系统事故处理实例,阐述了陈村水电机组在安徽电网中的特殊作用,并对影响水电机组顶峰发电相关因素进行了深入分析,对顶峰发电这一新的电网辅助服务形式进行了探讨。
As the largest conventional hydropower plant in Anhui Province, Chencun hydropower plant plays a major role in peak load and accident reserve in Anhui Power Grid. In this paper, from 2007 to 2011, Chencun hydropower plant during rush hour summer peak emergency relief power grid peak pressure, with the system accident treatment examples, elaborated the Chencun hydropower units in Anhui power grid in the special role, and the impact In-depth analysis of the related factors of the peak power generation of hydropower units is carried out, and the new form of auxiliary service for the grid is discussed.